• Welcome~Beijing Anchor Machinery Co., Ltd

OEM China Switch Fork – Piston Ram Putzmeister – ANCHOR

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

With advanced technologies and facilities, strict high quality regulate, reasonable price tag, excellent support and close co-operation with shoppers, we have been devoted to furnishing the best benefit for our buyers for Concrete Pump Coupling , Concrete Mixer Drum Parts , Schwing Pump Spare Parts , We sincerely do our best to offer the best service for all the clients and businessmen.
OEM China Switch Fork – Piston Ram Putzmeister – ANCHOR Detail:

The piston of the pump truck is in direct contact with concrete, it is required to be sealed and wear-resistant. When we find that the water in the tank is muddy or there is concrete, we should realize whether the piston is seriously worn, and we need to check the piston. If the piston is worn, it needs to be replaced in time to avoid straining the concrete cylinder.

When the coating (0.2-0.25mm) of the conveying cylinder is not worn, and concrete mud or sand appears on the back of the concrete piston, that is, the back of the water tank, it indicates that the piston is worn. The concrete seal, guide ring, and dust ring should be replaced immediately.

Since the piston can be returned to the water tank of the pumping system through a simple operation on the control panel, the piston should be removed frequently for inspection. In addition, after the piston is returned to the water tank, the concrete seal and guide ring on the piston should be cleaned and lubricated with lithium-based grease, which can effectively extend the service life of the piston.

Post-maintenance of the concrete piston of the concrete pump accessories

After replacing the new concrete piston, post-maintenance must be carried out

1. Frequently withdraw the piston of the concrete pump fittings, clean and apply lubricating oil;

2. It is found that there is mortar in the washing room, and the concrete piston of the concrete pump accessories should be replaced immediately;

3. Replace the cooling water frequently, clean the washing room and keep it clean;

4. Add enough cooling water, and add hydraulic oil for concrete pump parts as needed to improve lubrication.

Part number: P121618001
Model:DN230/DN200/DN180
Application: PM Truck/Vehicle Mounted Pump
                    PM Tailor Concrete Pump
                    PM Truck- Mounted Concrete Boom Pump
Packing Type

1.Economical and Practical
2.Imported Gabe Rubber materials
3.Extremely wear/heat/hydrolysis resistant, and strength of the        material is excellent


Product detail pictures:

OEM China Switch Fork – Piston Ram Putzmeister – ANCHOR detail pictures


Related Product Guide:

"Sincerity, Innovation, Rigorousness, and Efficiency" will be the persistent conception of our company to the long-term to establish together with customers for mutual reciprocity and mutual gain for OEM China Switch Fork – Piston Ram Putzmeister – ANCHOR , The product will supply to all over the world, such as: Bangladesh , Serbia , Israel , We attained ISO9001 which provides solid foundation for our further development. Persisting in "High quality, Prompt Delivery, Competitive Price", we have established long-term cooperation with clients from both overseas and domestically and get new and old clients' high comments. It is our great honor to meet your demands. We are sincerely expecting your attention.
  • The company leader recept us warmly, through a meticulous and thorough discussion, we signed a purchase order. Hope to cooperate smoothly
    5 StarsBy Edwina from Bulgaria - 2018.09.12 17:18
    The enterprise has a strong capital and competitive power, product is sufficient, reliable, so we have no worries on cooperating with them.
    5 StarsBy Natalie from Swiss - 2018.06.28 19:27
    Write your message here and send it to us